Vogal Group was tasked by a food production customer to help improve their facility, with several mechanical installation projects, as part of a wider programme to reduce their environmental impact. We completed the new pipework installation associated with two new biomass boilers as well as integrating three existing gas boilers and two other biomass boilers, already installed on the site. Additionally, we modified the pipework around four 250,000 litre storage tanks, holding one million litres of hot water, so they were correct for the new pipes that we had installed. We also installed a steam turbine as part of the works on site.
In a separate project, we installed a bioenergy Plant with the related pipework to support the installation of a low carbon, heat and power solution. The bioenergy Plant had been designed and included a 1.5MW Combined Heat and Power (CHP) system. We integrated the CHP by identifying the safest and most efficient route for the pipework, prior to installation of the pumps and control valves, so all waste heat could be efficiently recovered.
The customer can now heat 16 hectares of greenhouses, for the production of vegetables, with lower operational costs. Another M&E project installed on time and within budget by Vogal Group.
Please Contact us if you need help in improving the infrastructure on your site